pl.may i place dry mix in casting of drain bed partialy filled
with water?if no pl explain.
Answer Posted / ram narendranath
Don't pour the concrete in partially filled drains because of there will be more water than the requirement for concrete in that case cement will may be drained out also. It is necessary to remove maximum possible water after wards fill the damp area with Coarse sand after wards you have to pour the concrete for Drain bed. Otherwise cement is to be add to water to maintain the cement quantity in concrete as per requirement.
Narendra
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
For fine aggregate which is most suitable River sand or crusher sand & why ?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
What is the ideal size of the living room ranges from small to large size?
what does the grad of cement shows (denotes)?
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
What is horizon or horizontal mining?
how to calculate the strength of rebound hammer test reading in building construction ?
What are the different theories of failure under static load?
what is high type road and low type roads
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
What is meaning of FREE STANDING STAIRCASE ?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
how calucate cement sand ratio for plstering