How to calculate the amount of cement & sand required for
plastering work with ratio 1:4 please give me an answer with
detailed step.
Answer Posted / matrix civil & structural
THE METHOD GIVEN BY Mr.BASU IS SEEMS TO BE APPROPRIATE TO ESTIMATE THE QUANTITY OF CEMENT AND SAND IN PLASTERING.
| Is This Answer Correct ? | 66 Yes | 21 No |
Post New Answer View All Answers
how to calculate spacing rod in column
What is rolling stock
How you can use different dimension tools in cad? What are the different dimensions available?
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
What is the difference between chamfer and fillet?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.
que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
What is the strength of 1:6:12 mix?
.5Ast
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.