How to calculate the amount of cement & sand required for
plastering work with ratio 1:4 please give me an answer with
detailed step.
Answer Posted / matrix civil & structural
THE METHOD GIVEN BY Mr.BASU IS SEEMS TO BE APPROPRIATE TO ESTIMATE THE QUANTITY OF CEMENT AND SAND IN PLASTERING.
| Is This Answer Correct ? | 66 Yes | 21 No |
Post New Answer View All Answers
What is fineness modulus ? and its sieve # ?
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
What are the methods of measurement? Describe it shortly
What are the techniques to measure road difference?
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
Material calculation of cm 1:6 for 1sqm
what is flexible and rigid footing?
Who designed the city of washington dc?
60-70 grade of Bitumen is VG-30 ?
Who built the sears tower?
what is the water cement ratio for plastering
what do you know that m20,m25
How good are the Weinerberger Porotherm bricks that are being used in construction in Chennai, India. Its being used in non load bearing walls and has a compressive strength greater that 35 kg/cm^2 and a density of approx.694 - 783 kg/m3.
why demand factor less then 1 ?
pls give me some basic informations in construction of a structure?