A company installed 36 machines at the beginning of the
year. In March they installed 9 additional machines and then
disconnected 18 in August. How many were still installed at
the end of the year.

Answer Posted / guest

27

Is This Answer Correct ?    33 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Instead of multiplying a number by 7, the number is divided by 7. What is the percentage of error obtained?

920


A speedboat whose speed is 15 kmph in still water goes 30 kmph downstream and comes back in a total of 4hrs 30min. What is the speed of the stream in kmph?

764


I need Matrix and Series questions with solutions.

1779


A, B ans C are three speakers. They have to speak randomly along with another 5 speakers in a function. A has to speak before B and B has to speak before C. What is the probability.

679


quants,logical,verbal

7414






rrb second stage written exam in aptitude test model papers

3311


The average of x and y is 6.5. if z=4,what is the average of x,y,z.

713


Find the next letter in the series B,F,J,P ---

795


Albert and Fernandes have two leg swimming race. Both start from opposite ends of the pool. On the first leg, the boys pass each other at 18 m from the deep end of the pool. During the second leg they pass at 10 m from the shallow end of the pool. Both go at constant speed but one of them is faster. Each boy rests for 4 seconds at the end of the first leg. What is the length of the pool?

1018


A team of 200 wagers undertakes building work of a bridge. The total time allocated to build the entire bridge is 20 days. After 10 days since start, 200 more wagers join the team and together the team completes the bridge in required time. If the original team do not get those 200 extra wagers, how many days they would be behind schedule to complete building the bridge.

1051


There are 200 employees in a company. An external vendor is chosen to Serve coffee twice a day. 100 coffee cups were offered by the company but as an incentive to have the cups in tact at the end of the day, the company offered 30 paise for every cup remained safely and charged 90 paise for every broken cup. At an end of a day, the vendor received Rs. 24. How many cups did the vendor break? 10, 20, 8, 5?

1640


Sita bought a handbag for Rs. 144 and got a percentage of profit equal to the cost price of the handbag. What is the cost price of the handbag?

821


Find out the Simple Interest paid for a sum of $4000 at the rate of 8% per annum for 3 months.

826


The main line train starts at 5.00AM and the harbor line train starts at 5.02AM. Each train has the frequency of 10 minutes.If a guy goes in the morning at a random time what is the probability of he getting main line train?

926


Find the total number of squares in 1/4 of chess board ?

677