If i have 200 test cases and we have to execute but we
don't have time to execute all testcases.within 1 hour we
have to execute that testcases and prepare the test
report.so how i have to resolve this problem? is there is
any technique in the testing.
Answer Posted / k.prakashchandra
Random selection.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
block diagram of 2 ups system connected in parallel mode?
What is an automatic controller?
Mr. mohh sahid m not satisfied for ur answer to the que weather the size of transformer increases or decreases withchange in fr for more detail go to the answer given by me
what are carbondioxide and dcp used in fire extinguishers
How does a battary stores charge in it? please explain in simple manner and in detail.thanks
WRITEDOWN FEW RELY CODES
in an electronic tri vector meter when the current and voltage sequence changes ? what is the effect of phase sequence on recording of meter
can any one know is sbi interview based on merit or based on roll number
static chagre
why do we need to use 3c+3e cable, normally i select only 3c+e cable and i think it is enough. pls explain the usefull of 3e cable ( in this project the earthing system is well done)
how to calculate vfd o/p voltage by frequency
why output is out of phase in case of common emitter?
What is transient response?
what should be the ideal gauge of wire (In sq mm) for different loads in Ampere?
what is capacitor voltage transformer?? how it is different from potential transformer?