how to do rate analysis for P.C.C 1:4:8 for 2.83cum(100cft)

Answer Posted / n sudheer

1cum=2000

Is This Answer Correct ?    9 Yes 22 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Wats the formula of eccentric footing and how was calculated from concrete qty

2560


the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm

1886


How to calculate plastering for elevated water storage tank

818


why do we provide haunches in rcc box or underpasses?

2475


Define block?

712






how to conversation of all construction material in to brass

4693


kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com

1399


for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area

1894


For making a new road in a village having a school & hospital , tell the steps of construction systemically ?

1161


For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.

1588


why is M30 grade Concrete use for Foothing & Column M50

2983


Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)

1801


What are your goals?

2102


insted of bentonite we can use any alternate material in piling ?

1700


factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard

1665