how to do rate analysis for P.C.C 1:4:8 for 2.83cum(100cft)
Answer Posted / n sudheer
1cum=2000
Is This Answer Correct ? | 9 Yes | 22 No |
Post New Answer View All Answers
Wats the formula of eccentric footing and how was calculated from concrete qty
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
How to calculate plastering for elevated water storage tank
why do we provide haunches in rcc box or underpasses?
Define block?
how to conversation of all construction material in to brass
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
For making a new road in a village having a school & hospital , tell the steps of construction systemically ?
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
why is M30 grade Concrete use for Foothing & Column M50
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
What are your goals?
insted of bentonite we can use any alternate material in piling ?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard