how much quantity a skilled labour and unskilled does Pcc
per day, if ratio is(1:2:4)
Answer Posted / jitender kumar mishra
you mixing the mixer machine or baching plant
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
wat would be the probable interview questions and GD topics for IOCL exam?
what is the meaning of degreasing of the euipment or line.
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
how i get all type of short type question answer about civil engg
What is the density of DLC & PQC and how it is differ from normal concrete?
What is rate of concrete surface rendering work per sqm
rate analysis for cement pointing 1:4 , for 100 sq m
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.
types of laps in column
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
why the profile of shell of natural draught cooling tower is hyperabolic.
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
How do you calculate load bearing capacity of a waffle slab?