how much quantity a skilled labour and unskilled does Pcc
per day, if ratio is(1:2:4)
Answer Posted / jitender kumar mishra
you mixing the mixer machine or baching plant
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
what is the theoritical percentage of concrete cubes testing per day?
Concrete cover for slab, column, beam and footing?
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
natucher of concrete &type of concrete?
what is the hanekom repairing material after concreting work
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
Explain what are the problems one might face while having a Cantilever balcony?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
how to calculate the length diamond shaped striupps in column
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils