How do you derive the quantity of cement & sand in brick work
construction in 1Meter cube, using CM 1:6 and bricks of size
19*9*9 cm

Answer Posted / saif raza

1# Brick required :- 650 nos
2# Cement :- 1.23 bags
3# Sand :- 0.25 cum

Is This Answer Correct ?    4 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

HOw much % of premium on DSR-2013 currently

1539


what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete

3534


Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?

1585


how to calculate the chair reinforcement length in slabs, footing or anywhere??

1882


What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)

1189






I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1642


importance of the soundness test to determine the quality of cement use for any construction

1695


what is castigliano theaorem

1833


How did the romans get water up hills using aqua ducts?

802


how can we calculate steel value, depending on load

1744


what is the permanent solution applied for restoration of leaning tower of pisa?

3061


 Which Types Of Bricks ? 

2519


what is the minimum compressive strength of clay brick

1759


can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???

1446


why we create short columns under grade slab?

1842