Why would an Engineer consider combining FEEDBACK and
FEEDFORWARD control in some applications?

Answer Posted / gonzales

In boiler when tripple element controlling required

Is This Answer Correct ?    4 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Yokogawa CENTUMVP R6.09 unable to download to Engineering Station with ExaOPC R3.75 The issue is when I try to download the common project section to the Engineering Station (STN) from the HIS in System View, it is unable to connect. The error displayed is: WARNING: Could not connect to equalize destination. (7001) Retrying. Number of retries = 0/1 ERROR: LdXopsLoadMain: connect error 10060 ERROR: Processing terminated due to connection error. (7002) Equalization end with errors. STN0149 ---- ERROR = 2 WARNING = 1 ---- Background: >Updated the ExaOPC software on the STN from 3.60 to 3.75 >STN operating system is Windows Server 2008 R2 >HIS operating system is Windows Server 2016 Stanard Solutions attempted include: >Ensuring all IP addresses are correct and all networked devices can be pinged. >The ability to ping a device using its host name from another device ( from HIS) >Ensure both devices firewalls are disabled. >The antivirus installed on the STN is disabled. >Ensuring both devices are within the same workgroup. >Added both devices to each other's Host and LMHost files. >Running IT Security tool after changing any administrative settings.

1616


what does it mean an active front end in vfd plz explain it briefly

1394


What is first echo & echo window in radar type level transmitter?

1268


what is the responsibility of an instrument commissioning supervisor

2630


dear friends, i have seen flow as the selection critriea in presure guage (bourdon tube) and i would like to know what is the relation between flow and performance of pressure guage other parameters i found in the data sheet are pressure max. 1ksc temperature max. - 50 deg c line size - 80NB operating range - 1ksc pr. guage range - 0-2 ksc thank u,

1717






Boolean algebra

1702


why we us isolation barrier in hazardous area how it works to protect the area and please clarify its current flow.

1504


can you provide me full detail about instrumentation in ONGC??

1736


why we r opening HOT BYPASS valve during startup of a compressor?

1590


Explain the working principle of lvdt?

684


What are the interlocks we have to check during the start up of LP/HP compressor?

1477


How an rtd work, and what volts/current goes to a rtd to measure the resistance?

719


can anyone tell me about the basic concepts to consider before to start a PLC panel wiring

1500


Draw block digram for well head from well to shipping pump?

1731


what is the reason while warning lamp is on while the engine is cranking?

1610