WILL ANY COLLEAGUE TELL ME THAT WATER RATIO IS FIXED FOR ANY
TYPE OF CONCRETE? OR HOW CAN WE DETERMINE THE RATIO OF WATER
IN A CONCRETE MIX.
Answer Posted / zakir
It may vary from 0.2 to 0.5
| Is This Answer Correct ? | 4 Yes | 3 No |
Post New Answer View All Answers
What is the use of extend command?
Gidc technical que paper
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
Define Workability ?
What is the biggest dam in america?
what is escalation?how it is done?
Why was the empire state building made of steel?
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
rimmer in pile foundation
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What is the difference between shear and tensile strength?
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
which method is used in semi-rigid connection design??
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??