IF we have three 30KW motor, these motors are connected in
DOL, star-delta and VFD respectively, what will be the fuse
rating for the above three?
Answer Posted / sanduri ramesh babu
3-phase 30kw means 40.21Hp, so rated current is 60amps. We
can use 60amp rating.
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
wat is d diffr btw shunt coil and trip coil in VCB?
if a.c supply is given to the motor,, what happen?
Sir, I have applied for the of Jr.engineer(Electrical & Electronics) & ASST. LOCO PILOT at ALL RRB BOARDS. please send me all RRB Boards solved papers in the year of 2001 tO till date. i requested send me the papers to my id as soon as possible (jet_0991@yahoo.com). (This is very urgent) Thank You,
What are the protection required for Transformer, motor, Line, Generator, capacitor, that all i have to refer which standard?(Like Transformer detail IS 2026)
How to calculate the Efficiency of Chiller
What is ramp signal?
The specific heats of the gas at constant pressure and constant volume are respectively 1.0 kJ/kg K and 0.72 kJ/kg K; the value of R for the gas is
Hi all I had applied for the RRB test in the ELECRICAL category. I would be pleased if any of you can sent me previous year question papers. Please forward the question papers to varshashahi@yahoo.com Thanks and regards Varsha
circuit diagram of trip circuit supervision relay
What is given by the definition in BIL IMP/PF = 950/395 kV. This was found in a name plate of a power transformer.
how i calculate the syncrones generator NGR resistance .if we have a 6mw generator line voltage of generator 11kv also line current 393.3 ampere.
What is Instantaneous Earth fault relay,how will work
Is it required to use Automatic transfer Switch in L&T panel board if we use AMF panel with DG set? How the single line diagram will be? Please forward the material to sreenu_207@yahoo.co.in
Which type of air compressor is used now a days in the market. Keeping in mind of energy efficiency and maintenance points. Relevant documents may also be sent on mentioned email ids.
how generator load test is conducted?what are the steps?