Answer Posted / chaitanya
Batch processing execution is of two types:
i)Sequential
ii)Parallel
By using Timer task we can stop a single session.
By using Control task we can stop top level execution also.
Options: Fail Me,Fail Parent,Fail top level workflow
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is powercenter on grid?
Explain the tuning lookup transformation - informatica
What are pre and post-session shell commands?
During the running session, output files are created by informatica server. Enlist few of them.
what is INFORMATICA TESTING process
What the difference is between a database, a data warehouse and a data mart?
On which transformations you created partitions in your project?
whats the logic to load the lower level of granularity of data to fact table.
How to convert multiple rows to single row (multiple columns) in informatica
To import the flat file definition into the designer where should the flat file be placed?
What is the need of etl tools?
Dimension Object created in Oracle can be imported in Designer Cubes contain measures
COM components can be used in Informatica
3.how will u get information about bugs how will u rectify the bugs in realtime whch tool we are using to rectify the bugs
in reporting we add some new objects,how we get the count of the newly added objects to the report