An 11kv system consisting of an underground cable to a sub
station about 300 meters away was shut down for about 10
hrs. On energising, it tripped off on earth fault about
10---20 mins later 6 times but since than it is not
tripping.its already 3 weeks now. The SPAJ was found to be
fine. what could be the cause.No test had been done to
determine the cause of the trippings till now because of
demand.
Answer Posted / pillay
thanks but I had managed to ON the system and remained
energized with some load for a few minutes (10 -20 mins)
before it tripped again on earth fault , it happened 6 times
on (4/6/2011) and till today (13/07/2011) no problem. we
are using ABB spaj oc/ef relay.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Write the force balance equation of m ideal mass element.
what is sustainable current of any conductors . a bare busbar or pvc cable has different sustainable current .
induction 3 phase motor terminal connection
CBCT selection
how we calculate the short circuit capacity of the busbar in LV & HT?
why transformer tank is in rectangular shape what happen when it is in step shape
if we apply 1000ADC instead of 100ADC or We apply 50ADC instead of 100ADC,What will be happened in the test result value.Pl explain
Explain marx circuit.
Brief me about maintenance planning & sheduling of machine tool.
I HAVE A 50A MCCB AS PER DESIGN LINE WIRE CONNECT UPWORD SIDE AND LOAD IS CONNECTED TO DOWNWARD SIDE TO THE MCCB.IF NOW ANY ONE CHANGE SUPPLY & LOAD(WISEVERSA) WHAT HAPPENS ? DOES MCCB OPERATION OR WORKING FUNCTION NORMAL IF YES THAN WHY THERE ARE MARKED LINE & LOAD ON MCCB.
Why do we require transformer with less specific weight if supply frequency is increased?
Whether should be the oil level in OCTC transfomer? It should be upto winding immersed completely or should be upto tap changer s/w? How it will affect the performance of the transformer. Rating may be 33KVA
Define newton's law of viscosity.
How can I model an open-delta ground transformer for a network supplied by 4 unit GTG and power transformer in ETAP?
plz send me the syllabus or any sample paper for engineer trainee recruitment if any,on ravinder911@yahoo.com