Kindly tell me how much extra steel bars are provided in a
RCC roof and distance of bends in different sizes of roofs.
Please also tell me that bars provided in chajja are taken
seperate or main bars or short bars are extended in chajja.
please send me the answer@ suhail_akhter@hotmail.com
Answer Posted / modipraveen
Dear Suhil,
There is no extra bar will be provided for slab "but in
design extra load/further extra floor will considered",
Distance of bent bar are depends on span its varies to L/3
to L/7, and Slab's reinforcement will continue to Chajja It
may main or secondary/distribution rods, concept it to take
chajja's load on slab/beam, its just over hang the slab...
| Is This Answer Correct ? | 4 Yes | 4 No |
Post New Answer View All Answers
Advantage of Aluminum form work in terms of activities can be skip and cost too
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
What is zoning permit?
how much one carpenter can doing shuttering of slab in one day
Will going from a 3-tap to 6-tap increase water pressure?
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1
how to find ssm in foundation?
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
what is the meaning of degreasing of the euipment or line.
Define What is unit weight of normal concrete?
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
five benefits of using standard terminology in the measurement process
though u r a civil engineer, y r u interested in tcs???
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.