Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

break down of electricity is more in summer or in winter ?
give reason

Answer Posted / ks chiranjeevi

Due to heat, the transformers will get heated up and the
inside oil viscosity will become lesser and the transformer
primary and secondary coils will be short circuited.
Due to less water availability, the Hydroelectricity will
becomes less leads to shortage of power.'
Due to heat in summer, the turbine connected alternators
will become prone to more heat compare to normal heat in
other seasons, the unit trips.
Due to heat in atmosphere, the people draws more power
through water coolers, air conditioners, etc., and shortage
in power causes power breakdowns.

Is This Answer Correct ?    5 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

If the earth is a good conductor of electricity, why don't people get shocked every time they walking on earth?

1896


What is voltage divider rule?

1237


What is bode plot?

1305


What is the voltage gain or transfer function of amplifier?

1179


What are the main faults of DC generators?

3067


what is the illumination level required for child play area?

2126


Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.

1644


how can i find cable size from current rating?

1815


how we calculate electrical load on a building according to area?

2848


How the PF control while running DG set with load

2214


a 230v transformer with step down ratio 19:1.it has 2000turns on primary and rated 25va calculate max primary current no of secondary turns volts/turn

1613


How to choose the vector group for the step up and step down transformers??? Tell me the which vector group is suitable for step up and step down transformers and whats the reason to choose and whats the benefits???

2321


Compare jfet’s and mosfet’s.

1328


describe the phenomena of vacuum interruption in C.B

1845


Y phase plates are used in transmission line??? what is there need???

2971