The document / drawing that is primarily used in depicting the
“Bill of Materials (BOM)” of piping system is the
Answer Posted / donnie
The Isometric is used for BOM and Installation.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What pressure results for a flow transmitter of range 0- 180t/h in the dcs and 0-301mbar in the field using square root extraction. Kindly also suggest formulae for the percentages 0,25,50,75,100?
what is the difference between -24 : +24 & 0:24 and where it use?
WHAT IS MEANT BY PROJECT MANAGEMENT STRATEGIES IN INSTRUMENTATION?
Draw a simple circuit for a well head control panel used to protect the well against fire, leak, blockage, ESD, & controls the operation of one downhole & one surface safety valve. Explain the operation and controls
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
Emergency Shutdown Systems/ Plant Shutdown System.
steps for installing orifice plate?
What is Span Error
Explain about safety integrated level protection? . How it was differ from other protections ?
How can i test procedure grounding for CAT-7 cable? Or How can we test procedure CAT-7 Cable Electrically safe?
What is difference between Ionization heat and bimetallic heat
How is flow measured in square root?
What is the function of solenoid valve in on/off & shutdown valve and why it is not used in control valve normally?
Is there any relation between Artificial Intelligence and Instrumentation?
What is the cascade control