in cascade loop
the parameter to be controlled is in series with another
parameter which is to be measured for normal operating
conditions

i.e 2 manipulated variables are in series
it is used in fractional distillation system , boiler
operation in power plants etc

in pid
only one variable is measured and controlled at a time
it is used for temperature , pressure , flow control system


for drawing pls search in google

Is This Answer Correct ?    4 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

send me last 5 years questions asked in rrb chennai, for section engineer

2182


please send me some question papers of HPCL aptitude test ?? please send it to bipinb.28@gmail.com ...

2074


plz send me general of ongc

2050


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

2262


please send data bank of quetions answers on analytical instrumentation.

1987


hye SAM acn u send your e mail id, so that i can solve my query through e mail?

2348


plz you help about Que paper of mahagenco previous your,any model paper relad to it{maharastra power genration}

2407


please tell no. & add. of consultancy who recruit me in power plant as instrumen engg. present i m working in power plant as ass.t instrument engg. thanku mahesh 09226562826

2178


pls suggest suitable MOC of diaphragm for pressure measurement of UREA grade solution service fluid.

3224


give me all the details about the interview and which type of question being asked

2301


where cascade loop use ?

1787


principle of dead weight tester ?

2164


What are the key features of a Distributed Control System? describing the various layers (sensor through to business system interfaces) as well as the hardware, software and security aspects of the DCS.

2295


sir, i preparing hpcl,ongc,barc,hal exams(instrumentation engg)pls send a placement papers

2395


Can any body help to get Rsemulator 5000 free from internet if possible then give me any link or any help .

2581