Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why middle phase should used for earth fault and other
phases used for over current in overcurrent and earth fault
relay?

Answer Posted / vishal ingle

Not necessary to use only the middle phase.
our Back up protection cosist of two overcurrent elements
and one earth fault element.
under normal condition vector (IR + IY + IB) = 0
in fact middle phase is not used for earth fault prot.
Earth fault relay is connected between the star point of
all three phases (after O/C Relay) and the earth. if any
unbalance occurs, the unbalance current will flow through
the e/f relay.

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to arrange a hous hold earthing system to keep minimum earth resistance( below 7ohms).

1992


if any house we instaled a 1.5 ton ac and its phase cable of wiring is installed but netrual cable of wiring not instaed. my question is that is neutual of house(for other wiring is capable for ac load or a sepeart neutrual wiring required

2479


If i am running of spindle at 2000rpm ,but How to spindle stop at the second I am resetting the machine in CNC machines

1641


In power transmission using open belts or horizontal shafts it is preferable to have the slack side of the belt on the top because

1234


What is the difference between a Root Locus plot and a Bode plot?

1290


Is there a possibility to use such a treshold voltage for the NMOS part of a CMOS circuit that during the switching it will start conducting only after the PMOS part will be already closed, by this eliminating the leakedge current? Please note, I'm not asking about the well bias in standby mode, but about the "antileakedge" measures during normal operation.

2079


State the factors, for the choice of electrical system for an aero turbine.

1173


What is mason's gain formula?

1307


WHAT ARE THE DISADTAGES OF SINGLE-WIRE-EARTH-RETURN SYSTEM USED FOR RURAL ELECTRIFICATION?

1983


in india per day how much power is generated including all power station

1971


What is pole of the system?

1156


Why Ac Systems Are Preferred Over Dc Systems?

1314


What should be current in the Primary and secondary side of 1000KVA (11KV Supply)Transformer.?

1062


What is the best thing to protect the motor from running over full current. CT or O/L or pressure transducer at the given pressure rating

1547


how many joints are allowed in underground HT cable of 1 KM

1883