IF THE OUTPUT OF A 100KVA, 415V GENERATOR IS STEPPED UP TO
11KV WITH A 500KVA TRANSFORMER,CAN THE TRANSFORMER BE
LOADED ABOVE THE SOURCE GENERATOR RATING?
Answer Posted / karthik.j
No. Tranformer is for only stepping up the voltage, not the
power which should not be allowed to rise above the
capacity of the generator
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
Is it true online ups having bypass mode if it is true then why we called ups because it is interrupting power when goes in bypass mode
What do you mean by screen of power cables?
Classify driling machines.
What is the difference between hot and cold loop testing?
When lag/lead/lag-lead compensation is employed?
HOW WE CALCULATE CURRENT IF THERE ARE NOT PRESENT ANY AMMETER OR MULTIMMETER??????
What are the advantages of the three-phase motor over single phase motor?
Benifits of 3ph 4 wire metering over 3ph 3 wire
What is the difference between DOL starter and star delta starter
single phase power supply give to separate one steel coup with water, what reaction create
When is lag lead compensator is required?
What is resonant peak?
The knee point of a current transformer is normally unique and known.So why in the nameplate of a CT they put the minimum value like this Vk> 400v.
in general it is observed in power stations, the tertiary winding is used in higher rating Y-Y auto transformer but not in Y-Y power transformer. is the tertiary winding is compulsory then why it is not using in power transformerÂ
how to compare with Relay settings for HT< panels, RMU panel, and PSS CSS transformer?? 1) Load amps, 2)Tripping time, 3) CT ratio, 4)Cable size 5) Transformer KVA rating 6) transformer full load amps