The MVA rating is only based upon the generating MW capacity
of the plant.
For Example:
50MW is generated in the Powerplant.(i.e. Generator
capacity is:50MW,11kV,0.8P.F,3000RPM)
Now we like to connect this 50MW power to the E.B.grid
then we use one Step UP Transformer i.e. to step up the
voltage from 11kV to 220kV.
Now we can calculate the MVA rating of that step up
transformer as:
i) MVA = MW/costeta
MVA = 50/0.8 = 62.5MVA.
This is the answer.....
By,
Karthik(Engineer)
| Is This Answer Correct ? | 11 Yes | 7 No |
Post New Answer View All Answers
what happens if earth of 33kv cable is not connected to earthing pits? please send this query's answer to ngrm.sudha249@gmail.com
How to know the Max. current caring capacity of the cable by its size ?
Why phase sequence must be same in any ht motor or generator circuit?if phase sequence doesn't same whatever will be affect on circuit?
Dyn1 transformer vector group testing how to do
what is the star delta connetion and how can do it a three phase motor with control witing with picture
What si the d/f b/w KVA & KWH, kvarh & kvar, kwh & kvar phase voltage & line voltage
pre arcing time of ehv breaker
how will calculate the safe starting current of 3-phase squirrel cage induction motor?
and gate circuit diagram,amplifier circuit diagram
Classify driling machines.
What are approaches to tackle sedimentation problem of reservoir?
what happens to the water pump if ground water level is slowly decreasing?our water pump is varying from no-load full-load due to this problem
Explain Energy and Power signals?
What is the previous name of Cox's Bazar
checking procedure of capacitor based motors.used in fans etc?