Wat are the documents we prepare in Implementation Project?
Thanks in Advance.
Answer Posted / reach2muhammad
Documents are preparing in every stages of asap methodology.
For example.
1)Project preparation stage-
-Scope of project, objective of project, resource involved,
hardware software, landscape design document etc
2) Business Blue Print-
- As is document, to be document, Gap, fit gap analysis,
Business process re-engneering (BPR.
3) Realization-
-Test Scripts (unit, integration, regression), fit gap
ananysis report,
4)Final preparation-
- Test script, User manual/dest top procedure-DTP, training
documents etc
| Is This Answer Correct ? | 14 Yes | 1 No |
Post New Answer View All Answers
Can items in a sales order belong to different distribution channels?
How to assign sales group to sales sales office?
What is information structures?
Does sap transportation management support optimized routing and last mile planning? : transportation management
Define a shipping unit?
I have a shopping mall. If a customer comes to my mall and if he purchase or not anything I give him pen free. How we map it in sap?
What is the relationship between sales organizations and company codes?
In vfo3 invoice date is showing before billing date invoice date is showing sep 25 but billing date is showing sep18th In wht case the Invoice date is before Billing date
What is higher level item category?
Give a definition of plant (in sap).
Do I have to change the update rules/source fields for the infostructure?
Can any body please send sap sd foreign trade user manuals.. chavamba@gmail.com
What is a sales deal and how to configure it?
how text is determined in Invoice,What are tools used in To_be study
I have created value contract with order type WK1 in VA41. The target value is 500 USD and the net price is 1000 USD. There was no pop up message or error thrown while saving the contract when the net price exceeded the target value. And the system allowed to save the contract. Is there any configuration available to activate the warning or error message or any enhancement need to be done?