Answer Posted / rohit garg
For a power plant Maximum Demand is a important factor for
deciding its billing and the requirement of power from the
electricity board. It is defined as the peak demand of
power whenever the maximum load is there in operation or in
running process in the plant for the particular time period.
Maximum Demand is used to decide contract demand too and it
is generally kept at 75-80% of contract demand. If demand
of plant exceeds maximum demand limit at any time there
will be penalty for that.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
What is the basic principal, by which DC voltage level is increased more than the supplied AC voltage during conversion. As upto AC level it is contorrled by firing anlge but after maximum level how is it possible.Please clear picture. OR we have to supply the higher level AC?
how the characterstics of control valve being done
What are safety device in vcb and acb?
which type of cabel
Pls tell me whether we can use EN3A material for shafts of Permanent magnet alternator.What will be the effect of magnetic and nonmagnetic material for shafts on magnetic properties of PM rotor .
why lightning arrestor are made in two stack of insulator but why not cvt
hi i have applied for lic of india south cenrtal zonal ,hyd. i didnt get hall ticket till now.let me know how can i get form internet
what is the purpose of silicon dropper used in battery charger?
What are the advantages of nichols chart?
What do you mean by lighting transformer?
What are the material used for resistor?
Write the analogous electrical elements in force current analogy for the elements of mechanical translational system.
For a stable system, where should the poles of a system be in a root loci plot?
can we find the inductance of a induction motor?
How short circuit MVA(Fault MVA) in a power system calculated for calculating number of earth plates ?