If the program buffer Hit Ration is <98%, then what should
be done by the Basis consultant?
Answer Posted / rajesh chowdary pendyala
we can increase or decrease the buffer size based on the
below analysis.
1) buffer space or directories are not optimally defined
(more buffer swaps in st02 marked in red color)
2)new module is implemented by client so as per that we need
to change the buffer parameters.
3) mass transports to the production wich dis-locates the
objects from buffers.
4)when the instance is holding the load dus to fail over in llb.
if log on load balance is configured we need to synchronize
the buffers of the instances witch belong to same group.
for that we need to set the following parameters.
rdisp/buffer mod=send-on exe-on
rdisp/buffertime=60 sec
based on the above analysis and we can see the current
buffer parameters in st02----->shift+f5 and we can change
the parameters accordingly.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
what is role of sap administrator in pi & ep?
What are the different options available for scheduling a background job? What start conditions type can be used?
what is garbage collector. is there any way to set the time to gc?
Transport request types and its syntax?
What is MySAP?
How to check cpu usage in EP?
How to configure TMS?
Hi I am new in this forum and in this practice. can anyone help me out in finding out how to get training material for SAP CRM 2007.
How would you troubleshoot the 'system seems slow'?
What is ocm and how to apply ocm patches?
How you will give new authorizations?
How you can assign an object to 100 roles at time?
What is the database backup strategy in your company?
Some transactions in sap are seen as customizing, for instance ovrf (updating routes). In some systems this is set as master data and can be set open. Where do you do this?
TMS Configuration?