Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is ment by surveying?

Answer Posted / janardhanchinnu

Surveying is the art of determination of relative position of points on,below and surface of the earth is called surveying.

Is This Answer Correct ?    22 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is Time period of a building and its relation with frequency ?

1427


Civil engineering material testing Standard results

2344


What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.

1974


How good are the Weinerberger Porotherm bricks that are being used in construction in Chennai, India. Its being used in non load bearing walls and has a compressive strength greater that 35 kg/cm^2 and a density of approx.694 - 783 kg/m3.

2834


Will water damage concrete?

1250


If specific gravity of cement is less than 3.15 what is the cause?

2294


Why should you show Client/Engineer activities clearly on the project plan?

2396


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

2253


what is the difference b/w full length and cutting length?

2213


Explain the advantages and disadvantages of using plastic and timber fenders?

1161


A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.

2242


what is the hanekom repairing material after concreting work

2396


How to do bbs in excel format

2186


What is portland cement

8069


how to calculate the length diamond shaped striupps in column

2730