please tell me the function of transformer
bushing,s. i heared somewhere that it saved transformer
winding from sky electricity. please tell me if that is
right then how it work,s.
Thank,s.
Answer Posted / bishnu das
first function of the bushing is to connect the winding to
the line with an insulation sorrounding the transformer.and
one lightening arrester also present in the bushing to
protect the tranformer winding.
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
What is the practical way to calculate the cable size for known ampere load?
I have 2 KW electric water heater.I am gonna use it in controlling water temp.so I needed to increase or decrease the heating capacity.is there any electrical-electronic circuit for varying the resistance & so current?
Distinguish between nuclear power station with thermal power station for initial cost, starting period, cleanliness, and transportation of fuel
What do you mean by distribution transformers?
What was the Dg set radiator and lube oil temperatures trip in ACB
What is the role of feedback in a closed loop control system?
when will be the iocl interview results i faced interview on 8th september 2008 iam from electrical branch i faced interview for the post of electrical engineer??????????????????????//
what clearance required for 4.5 mva dry type transformer?
HOW TO WRITE A QUENTION ANSWER? I MEAN SHORT OR LENGHTHY ? OR FROM THE BOOK AS BOOK..... SOME TIME WE GIVE A ANS FROM THE BOOK AS LIKE BOOK ND WE GET MINIMUM 60% MARKS OR MORE THEN....... THEN HOW TO FILL THE Q-PAPER?
which are the criterias needed to select the kind of neutral earthing(solid earthing,resistance earthing,etc.) at various voltage levels in electrical distribution?
HOE WE CAN IMPROOVE BY USE OF CAPACITOR
Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.
why the value of k is more in shell typr transformers?
Is there possible to Test Transformer for Overfluxing Capability. Or is there any firm who does Overfluxing Test on Transformer?
how can i get the formula to find out the cable size if i know the load of main fuse protection.