Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

HOW DO YOU PROVE THE HIGH VOLTAGE CABLES OR BUSBAR IS DEAD
EVEN AFTER IT IS DE ENERGISED

Answer Posted / kedar

After taking all the necessary steps to discharge the bus-bars even then u r not confirmed. Then you should use a special meter which works on induction principle which senses the magnetic field of the bus bar and will tell u whether the bus is discharged or not.

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what happen if the load connected to the induction motor is taken away? the same question for synchoronous generator in synch i think that the the exitation voltage will appear on the terminal only if so plz answer me

1979


I have a current transformer with 1 main reading meter with transformer outside the building and a control panel having 5 CT reading meters with black round coils inside the building. I want to know, A) when current pass through the Transformers, will the current be reduced or be the same and after that B) when current pass through the CT meters with black round coils, will the current be reduced or be the same. C) in the above process will the reading of the main meter be same or different, from the total reading of all the 5 CT meters.

1788


Would you recommend to replace all oil filled cables with xlpe cable for hv transmission with the current technolgy for xlpe cable?

1463


hwat type of motor is used in thermal gas turbine hydro nuclear power plants and why

1872


What is the maximum and minimum rating of UPS?

1476


Transformer cores are laminated in order to A simplify its construction B minimize eddy current loss C reduce cost D reduce hysterisis loss

3256


what is the sludge current

2099


when the time of backcharging the transformer three phases only enough or three phase with neutral is must.from these which one is the best one.

2025


Difference between earthing & grounding.?

2119


How to calculate the copper in HT motors if KW, RPM & Voltage is given

3185


1600 KVA ka transformer hi aghar lt side par 800A aur voltage 420 ho to HT side ki cable ki rating keya ho gi?

2010


how to select size of hardware for linking aluminium busbar is it depend on area of busbar or current flowing through bus bar

1994


for 5KW resistive load can anyone please suggest me whether to go for UPS/Inverter or Generator depending upon cost calulations

2067


In constant power region of 3-phase IM torque-speed characteristics, if frequency increases flux A does not alter B decreases C increases D none of above

2220


What is big transformer parts and their function ? Ty

2182