How to calculate cement and sand quantities in cement mortar
As 1:1,1:2,1:4,1:6 ?
Answer Posted / kamlesh patidar
in cement morter the void between sand and cement is less
and take 25% total wet volume of water.take 10 cu m wet
volume of morter increse 25% than total volume of dry
material 12.5 cu m . if we find the material in 1:6 morter
than 12.5/(1+6)
cement=1.78 cu m sand=1.78*6=10.71cu m
| Is This Answer Correct ? | 11 Yes | 17 No |
Post New Answer View All Answers
Explain how you can turn off the display for dimension in CAD?
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
Is there the dry coefficient of cement is constant?
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
What is reinforced concrete?
How to calculate the crank rod in slab
What are the responsibilities of a construction manager?
How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.
What is Gsb tollens ?
how many tonnes equals to one cubic feet?
What is the difference between yeild strength and compressive strength of steel???
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
How you can use different dimension tools in cad? What are the different dimensions available?