How to calculate cement and sand quantities in cement mortar
As 1:1,1:2,1:4,1:6 ?
Answer Posted / kamlesh patidar
in cement morter the void between sand and cement is less
and take 25% total wet volume of water.take 10 cu m wet
volume of morter increse 25% than total volume of dry
material 12.5 cu m . if we find the material in 1:6 morter
than 12.5/(1+6)
cement=1.78 cu m sand=1.78*6=10.71cu m
| Is This Answer Correct ? | 11 Yes | 17 No |
Post New Answer View All Answers
List out some of the software used in the construction sector to estimate cost and monitoring expenses?
Difference between pre-tensioning and post-tensioning.
What are the skills required to become an architect?
how many kg of 20mm, 10mm, dust available in one ton stone boulder
What is the difference between undo & redo?
what is Brest Wall?
What tor stands for in tor steel?
WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?
how many cement used in single story residential building per sqft
How to calculate woden area in sft and Cft
how much of the strength comes from post-production curing
why demand factor less then 1 ?
Wat is meant by Aecron brick?
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
Pls provide me with the calculation or codes related to de- shuttering of flat slabs