What are the tools used in SAP PP support project?
Answer Posted / ajay fulluke
MRP
Production Order
Is This Answer Correct ? | 4 Yes | 22 No |
Post New Answer View All Answers
What are all the settings done for configuring the integration of pp with fico?
Explain DMR.
Integration between PP and QM Module.
What is the Difference between TECO and CLSD?
Define ‘bom group’?
Difference between Item categories or what is variable size item or non stock item.
What is the recruitment cycle?
What do you do to run MRP for just one MRP Controller?
We defined sop in months. However, during sop transfer to demand management, our independent requirements are appearing in weeks. How can we correct this from weeks into months?
What is qualification deficiency?
Explain the uses of the simple maintenance interface?
You want to insert an inspection check point at the end of an operation. How would you do that?
Can't one material be assigned to more than one operation in a routing, why?
How system calculate the actual cost?
What is Inspection Points?