How much kg of sand,cement will be for 1 sqmt(Blockwork-size 400x200x200)1:4 ratio & same for plaster
Answer Posted / harinath sharma
It's depend upon thickness of block work, if 4oo mm block
work then it's required 0.28 bag cement & 0.04 cuft sand.
for 200mm block work it's required .0106 bags cement,0.0147
cuft sand.
for plaster quantity depend thickness of plaster.
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
Define a polyline?
pile load testing procedure
Describe the role of independent Quantity surveyor?
What is Heavy Concrete & Normal Concrete
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
How much material will consume for following specification water tank (9*7.5*6 feet)?
What is missing report and how to prepare
How to design staircase.plz tell me formula for the design the staircase.
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
to minimize budget cost of building , what can i do
what are the changes in concrete pour height as per IS 456, 2009?
what are the types of design? which type of method is used at what type of design & why?
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
What is a projection line?
very simple or less time consuming formula for reinforcement calculation by moment