Answer Posted / k.prakashchandra
It is also called 'Line clear' or 'Work permit'
Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
what reason of line current and phase current in star connection and line current and phase current not equal in delta connection?
What is real time power factor control panel(RTPFC)?
block diagram of 2 ups system connected in hot stand by mode?
How to check the cable fault / hv test of transformer cable.
wat is the current produced in a 5000v megger? when the positive and negetive terminals are touched on our body get s shock?
determine two methods to find loose connection in operational electrical system?
WHAT IS AIR GAP VALUE IN MM FOR A 11KV BUSHING OF 11KV/440V DISTRIBUTION TRANSFORMER. AND AIR GAP VALUE OF 25 KV BUSHING OF AT TRANSFORMER OF 25 KV TRACTION. WHAT IS THE CALCULATION FOR THE AIR GAP PERMITTED FOR BUSHINGS AT DIFFERENT VOLTAGES.
Draw a SLD of HT distribution EB grid up to users Transformer?
what happend to DC shunt motor if its field winding insulation becomes slightly weak? will that motor can run on full load or not explain in detail. thanks
State and define ohm’s law?
what is the constructional difference between a power transformer and potentian transformer?
What is the importance of earthing?
what the function breaker failure scheme, how is it operated
what parameters are should nessary for control technic dc drive(in rolling mills)?
What is genrally the % Impedance of a Dg set? How can we calculate Earthing conductor size for a DG set?