Company A taken a truck on rent of $1280 per month another
company B bought the truck in $40000 and send $120 per
month. After 4 years what will be the difference in the
amount spent by the both companies on the TRUCK.

Answer Posted / vijendar kumar

1280*48=61440
40000+(120*48)=45760
difference=61440-45760
=15680

Is This Answer Correct ?    145 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

33 1/3 of 101 + 296 is

919


starting from 2 upto how many numbers we need to check whether 907 is prime or not?

1332


Draw venn diagram relating rhombus, quadrilateral & polygon

845


There are two balls touching each other circumferentially. The radius of the big ball is 4 times the diameter of the small ball.The outer small ball rotates in anticlockwise direction circumferentially over the bigger one at the rate of 16 rev/sec. The bigger wheel also rotates anticlockwise at N rev/sec. what is 'N' for the horizontal line from the centre of small wheel always is horizontal.

1032


500 men are arranged in an array of 10 rows and 50 columns . ALL tallest among each row are asked to fall out . And the shortest among THEM is A. Similarly after resuming that to their original positions that the shortest among each column are asked to fall out. And the longest among them is B . Now who is taller among A and B ?

833






How many 3-digit numbers with atleast one 5 in their digits?

750


what is the angle between two hands of a clock when time is 8-30

744


If 12 box containers require 18 feet of wall space, how many feet of wall space will 30 box containers require?

1130


A man while going down in a escalator(which is moving down) takes 50 steps to reach down and while going up takes 125 steps. If he goes 5 times faster upwards than downwards. What will be the total no of steps if the escalator were'nt moving.

763


if 8x+4y=6 and 4x+5y=7, x+y equlals

697


In a queue, a man is standing at the position 10th from the front and 15th from behind. How many persons are standing in the queue?

829


guttural : throat :: gastric :

709


One skirt requires 3.75 yards of cloth. How many skirts you can make from 45 yards?

787


6 women can do 75 units of work in 8 days by working 5hrs/day. In how many days can 4 women do 30 units of work by working 8hrs/day ?

1385


In a soap company a soap is manufactured with 11 parts. For making one soap you will get 1 part as scrap. At the end of the day u have 251 such scraps. From that how many soaps can be manufactured?

852