Answer Posted / jayaraaj
1 bag of Cement Contains 50Kg
in 1 cum required cemnt is 1440kg
since,Volume of one Cement bag = 50/1440 = 0.035m3
:1 bag = 0.035m3 volume
| Is This Answer Correct ? | 19 Yes | 4 No |
Post New Answer View All Answers
what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building
what is anchorage length,lap length and (dont remember the last one)
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
How many pyramid in egypt?
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
how can we calculate steel value, depending on load
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
what pressure the NP2 class RCC pipe can sustain?
Explain the different types of roofing systems?
1m square 20mm plastering how much of water need curing work