Answer Posted / raikripashankar
IN indoor substations equipments are kept
inside the closed environment or buildings whereas the
outdoor substation tequipments are kept in
open environment or opened surroundings.
Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
where is the need for short circuit test for 3 see is required and why? can you explain in brief with application
How to calculate the time setting for star connection in star delta starter? For example 10KW 3PH Induction motor.
What will be the voltage regulation of a full load and 0.80 power factor lagging load transformer when a two winding single phase transformer has a voltage regulation of 4.5% at full load and unity power factor?
what are the specifications we must look at to select a relay for any capacity motor?
I Just want do EHS Certified Certification Distance Course From Govt approved,so can any body provide me details.
What range of speed can you get with the field control method of speed control of d.c. Shunt motor?
WHAT IS DEGREE OF COMPOUNDING IN D.C MACHINE MEANS? HOW TO READ THE OPERATING CHART FOR ANY ELECTRICAL MACHINES?
What is the direction of current flow in ct secondary...means if the current is flowing from P1 to P2 then what will be the direction of current flow in ct secondaryw
After doubling voltage from solar cells & use step down voltage transformer can we get high current output with low voltage.
Why reactive power is needed in a power system? How is it being absorbed or delivered by alternators? For reactive power control we are changing excitation but reactive power absorbing or delivering related to stator. How these two are interlinked? i want a detailed explanation with necessary expressions and figures?
what a function diesel generetaor turbo charger & turbo charger is more heated explain reason ?
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,
Form S and "c" license application both are same? @ tneb portal
what kvrah y we need to take the readind of that
how to calculate the surge level of surge suppressors related to the SF6 cicuit breakers?