Answer Posted / mobeen ahamd
material master
bom
routing
workcenter
mrp
| Is This Answer Correct ? | 2 Yes | 4 No |
Post New Answer View All Answers
You want to integrate pp with fico. What steps would you take?
What is plm (product lifecycle management) in sap pp and what is the use?
Explain what is the use of sap material view and list out other parameters where sap material view is applicable?
Integration between PP and MM Module.
what is alternative item group
What is 'mps' (master production scheduling)?
How to create PRT master record?
What is the difference between stock transport order and stock transfer order?
In cost controlling information system mention the fields that are listed in the list screen of the report?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
Where have we to specify the teardown time in one operation?
What is the difference between pp and pp-pi? Which one is better and how ?
What are the customer activities followed for pp module ?
Mention what are the types of master views for production and planning?
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?