In TMS we find two roots from dev to quality, from quality
to production only one root why ?
Answer Posted / ramaraju2470
We have two types of transport routes are there in TMS. one
is Consolidation Route and other is Delivery Route. We
configure consolidation route between Development and
Quality systems to transfer the data from the both the
systems(dev-qua, qua-dev).so they configure 2 transport
routes between Dev & Qua. We configure Delivery route
between Quality and Production systems. We cannot do any
customization or modifications in the production system, so
no data tobe transferred from the prdn system. That is the
reason they configure one delivery route between quality
and production systems.
| Is This Answer Correct ? | 4 Yes | 3 No |
Post New Answer View All Answers
What is the difference between asynchronous and synchronous transport?
Have you done any up gradations?
How do you check the users logs in your system and how many sessions each user is generating?
I want to let sap skip printing cover pages during printing for any kind of report. How can this be done?
I want to change five dialog work processes into batch. Where can I do this?
How to update SAP
how can we set a/r a/p netting for inter company code transactions? is it possible to do? if yes, give the solution?
What is the difference between kernel replacement and support package?
What is Unit Testing in SAP?
How do you kill a job in SAP?
I am attempting to complete a system copy of bw. When I try to go in to rsa1 afterwards I get the error message, "entry in inbound table already exists." What should I do to solve the problem?
What is the need of having Development system?
In a situation where my sap system is down (users unable to login to sap system), how to analyze the problem?
What is rfc connection?
How to make security authorization reports?