Answer Posted / naveediqbalsher@yahoo.com
PLC mean programmable logic controler
DCS mean distribution control system
before different plc have digital inputs & outputs but DCS
digital & analog both.
now new plc also both digital & analoge inputs & outputs
in plc we can not change in software during running but in
DCS we can.also plc for small inputs &outputs but dcs for
big industries i mean more inputs & outputs.
plc have quick reponse than DCS.
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
what is effect of specific gravity in differential level transmitter , explain formula related with this .
How works weighfeeders in cement industry? what is the working principle?
in sulfur process what is material of impulse line we use to connect with transmitter ? and does teflon affected by sulfur?
Meaning of the following a. IOP- Manimum; b. IOP- Maximu,;
Tr. Wiring for calibration.
Describe a time when you anticipated potential problems and developed preventive measures.
What is force balance principle? State some of its’ advantages.
Hi Friends , i need one urgent help , i am preparing for M.tech entrance examination , i need some obejective questions related to instrumentation field. where can i get those ? can anyone help me pls ?
the output of the common trasmitter protocol in qatar gas are the following
What is the constant voltage unit?
How the sizing of the analog signal cable is calculate?
hiii.... can any one provide me previous years question paper of hindustan petroleum for instrumentation engineering???
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
please send me the inteview questions in IOCL
1- Explain about HPM 2- What is the FSC and explain the configuration of FSC 3- explain the complete loop of vibration, how it works (field to control room) 4- What is the use of proxymitter? 5- During job your partner effected with H2S then what you have to do. 6- what type of gland packing uses when valve glind is leaking.