Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is LOTO?

Answer Posted / pichumani

It is Lock Out Tag Out Safety process in electrical
maintenance. It is used when any equipment is put under
shut down for repairs or maintenance.

Is This Answer Correct ?    14 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

is it necessary to earth the rmu before cutting off the transformer winding?if yes why?

1939


-What should be minimum value of insulation resistance and maximum value of earth resistance at any electrical instillation and what is method of testing the same.

2104


What are the operation carried out in thermal power station?

1063


What is creepage distance..... what will be the value for different voltage level

1985


After synchronization with grid what is the demand value QKVAR and how we will maintain that?

2273


What is boucholz relay and the significance of it in to the trformer?

1155


Testing procedure of DG alternator stability test

1571


The series field winding has low resistance while the shunt field winding has high resistance. Why?

1726


suri transmission

4759


In the ACB breaker capacity is 2000Amp but this each phase taken 1250 But total beldibg load is 600amp or 700amp watt is the problem

1964


# 4 hi friends i m from electrical branch and seeking for tech. + apti. both papers of hpcl plz get it available as soon as possible my email id is sumit_lig189@yahoo.co.in

2007


how we control automatic generator i'e with to supply (main supply and local generator) when the main supply was break to supply the local supply automatically to begin supplying power.I now this control circuit is the combination of contactor time delay contactor switch and overload relay .but my question is how we combine those component thank you

2005


Which contains in POLE ASSEMBLY of a 11KV Kirloskar-make SF6 (Model No-FP620A12)? Will u clarify with drawing?

2180


List examples of current sources?

1121


sir iam a 3rd yr eee student.no core company comes for recruitment to our college.my aim is to be placed in l and t.tell me the procedures.

2018