Answer Posted / uprabhagaran
PLC IS WORKING FOR PROGRAMMABLE BASED,AND ONLY DIGITAL
OUTPUTS,NO SCREENING.
BUT,DCS IS USING FOR CONTROL THE LOGICS,AND MONITORING.
| Is This Answer Correct ? | 4 Yes | 18 No |
Post New Answer View All Answers
hi my name is rakesh patel i just complited my be in instrumentation & control now i am going to working as a validation engineer in a poject department so what is a scope in a future as a validation engginer ? what line is good for me can any bady give me complete solution please? your regard rakesh patel
Q1: Consider part of a control loop, which excludes the transmitter, consisting of a process, a controller and a control valve which may be represented by two dead times of 0.5 min each and three exponential lags of 0.8 min., 1.0 min. and 1.5 min. respectively. We wish to express this system as an overall first order plus dead time (FOPLD) model ie gain, time constant and process dead time. (We will see later that this is often done, to simplify controller tuning). For this exercise, gain is considered to be 1.0. (A) If the transmitter is a flow transmitter whose behaviour can be described by a dead time of 0.2 min. and an exponential lag of 0.5 min. in terms of the overall dead time and overall first order lag how can the system behaviour be approximated ? Overall dead time = Overall time constant = (B) If the transmitter is a temperature transmitter with a temperature sensor in a protecting well whose behaviour can be described by a dead time of 0.7 min. and an exponential lag of 15 min. how can the overall system behaviour be approximated now? Overall dead time = Overall time constant =
how can leve transmetter calibate in feild .and also put cv and flow plz .....
What are the interlocks we have to check during the start up of LP/HP compressor?
How we calculate orifice plat size???
What is PDS and PDMS ?
I am using 971 Enraf radar level transmitter for LPG tanks ,the tank side indicator gives the error code 999999999FL can any body give me any diagnostic for this issue?
why we use the ac supply load cell>?can we use the dc supply load cell?advantages and disadvantage of the ac supply load cell?
How is PH sensor works ?
What is the difference between working pressure and calibration pressure of a control valve
What is the difference between uv and ir scanners? and what is the workig principle of both
Can combine control system for Emergency control system (ESD)and Fire & Gas System ( F & G) is possble to built and offer to client? Can such system is as per Norms in India?
How we can check the 2 wire proxy switch? & how it is connected to DI MODULE OF PLC?
control panel design guidelines
hello sir/madam, I,Subramanian need 5yrs placement papers of officer trainee of Instrumentation technology.pls send to this mail id mani_nxtgen@yahoo.co.in please do the needful. with regards, subramanian.v