what is diff. between CMMI and CMM levels?
Answer Posted / abhiram
CMMI means capability matuarity model intigrity
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
I. Requirements are formally reviewed. II. Requirements are formally approved. III. Requirements are placed under configuration control. IV. Requirements are implemented in code. Using the above statements, when are requirements considered baselined? 1. I and II 2. I, II, and III 3. I, II, III, and IV 4. I only 5. I, III, and IV
Testing an SAP B1 -Add -on ? How?Different types of testing done, functional areas to be tested, any check list for testing SAP B1 as SAP takes care of Date fields, validation of text fields, telephone fields etc.... ?What to be tested and how?
What is usability?
Explain test driver?
IN integration testing tester should knowledge of code or not?
What is user documentation?
Explain what is 'test plan driven' or 'key word driven' method of testing?
What is data flow analysis?
Explain code inspection?
What the different types of test coverage techniques are?
I need to learn who the major stakeholders are in each of the 7 stages of the SDLC. What is the best online resource?
What is the boundary value analysis/testing?
What is open box testing?
Mention what bottom-up testing is?
Hi do any one has dumps for ISTQB or ISEB exams for august or september exam 2013. Pleae mail qazwsx2631981@yahoo.co.in