what is procedure to find the volume of material in M20
concrete?
Answer Posted / muzammil ahmed
m20=1:1.5:3=5.5, dry mix for im3 is 1.57
1.57/5.5=0.285x30 = 8.5bags OR
=0.285x1500=428.18kg/50=8.55bags(cement)
=0.285x1.5 =0.427x35.28=15cft
=0.285x3 =0.855x35.28=31cft
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
What are the important hardware systems used for cad?
how to calculate quantity of bricks in circular manhole with examples.
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
Which is the best book for building construction?
what could be the production cost of 1 cum of concrete by CP30 plant
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
I what know about life time of frp tank plz explain about it specifications & other details
afe or not
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
Differentiate orthographic and isometric projections?
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
what is Brest Wall?
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.
How will you Engage Labours on Site?