Hello Can I use step up HV transformer 440/4160V as a step
down? Thanks
Evgeny
Answer Posted / ravinder
this is only possible when transformer is unloaded because
if we connect load winding,s of T/F ARE BURNout this
mightly be posibble
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What are safety device in vcb and acb?
What is the approximate value of stacking factor?
what should be correct gas pressures to be a 1.5 ac unite
Why do we apply both Differential and REF (HV and LV) protection schemes on YNyn configuration of a transformer?
What effect does a very low impedance have on the Voltage regulation? On the short-circuit current?
what is difference between elr and R eartl realy.
What is the de rating factor of cable? What is the importance of the de rating factor in cable selection?
Cb closed condition if there is a tcs fail whether cb will trip or not
If rotor works in clock wise what happens
What is difference between mcb and mccb.
What's mean HVF & HAF in Vacuum Circuit Breaker?
BRIEFLY EXPLAIN THE STORAGE CLASSES AND THEIR TYPES IN C
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
what is the operating time for LBB and how does the LBB relay realise whether cb is opened or not?
Can we test the alignment of End shield and stator of turbogenerator without rotor insertion? Also how to fix maintain the alignment at site installation?