Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the difference between datasatge and datastage TX?

Answer Posted / msuri

I think its difference between server and parallel jobs
Here is the diff

Server jobs. These are available if you have installed
DataStage Server. They run on the DataStage Server,
connecting to other data sources as necessary.
These are compiled and run on DataStage Server


Parallel jobs. These are only available if you have
installed Enterprise Edition. These run on DataStage
servers that are SMP, MPP, or cluster systems. They can
also run on a separate z/OS (USS) machine if required.
These are available only if you have Enterprise Edition
installed.
These are compiled and run on a DataStage Unix Server

Is This Answer Correct ?    3 Yes 14 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

if we using two sources having same meta data and how to check the data in two sources is same or not? and if the data is not same i want to abort the job ?how we can do this?

2285


i WANTED TO USE THE RANGE LOOKUP SCENARIO IN DATASTAGE 7.5.2 SRVER JOB.i HAVE A DATE FIELD IN SOURCE AND I SHOULD MATCH IT WITH A FIELD IN LOOKUP FILE.BUT,THE FIELDS SHOULD MATCH EVEN THOUGH THERE IS SOME RANGE.CAN SOMEONE TELL ME HOW CAN I DO THAT. THANKS

3810


Triggers,VIEW,Procedures

1266


Define meta stage?

1259


explain about citrix scheduling tool in datastage

2510


Define APT_CONFIG in Datastage?

1135


Explain entity, attribute and relationship in datastage?

1155


Define ds designer?

1328


What are the partitioning techniques available in link partitioner?

2328


what is repositery?

1928


Describe stream connector?

1360


In work load management there are three options of Low priority, Medium priority and High Priority Jobs which can be used for resource management. why this feature is developed when there is already jobs prescheduled by scheduler or autosys. what will be the use of workload management then?

1554


What is merge stage?

1382


How can we improve performance of data stage jobs?

1067


hi iam new to this tooliam cmpltied to know abt datastage so now iam in project tell me whole step by step what iam doing iwnt to go with exp so plz hlp me pals

1922