The sum of 5 consecutive integers is 35. how many of the
five consecutive integers are prime number
Answer Posted / sudhanshu_kmr
x + (x+1) + (x+2) +(x+3) +(x+4) = 35
=> 5x + 10 = 35
=> x = 5
numbers are: 5, 6, 7, 8 and 9
number of prime = 2
| Is This Answer Correct ? | 135 Yes | 10 No |
Post New Answer View All Answers
A person gives a secret to two other persons in 5 minutes. How long will he take to tell the secret to 768 people?
hai am Deepak here i have my exam on 3rd jan 2010 for the post of officers job in karnataka bank so kindly plz send me model papers . thank u
Find the number WXYZ divisible by 36? i) Let the digits be5, 4,3,6 -not in that order ii) Sum of last two digits is 9 iii) Sum of middle two digits is 7->If one is sufficient then ans as A || if two is sufficient then ans as B || if all are necessary then ans as C || if nothing is needed then
A and B's temperature are 10°c and 20°c having same surface , then their ratio of rate of emmisions is ?
if the radius of the circle is increased by 6% then its area increased by
In an examination 30% of the students failed in Maths, 40% failed in Science and 25% failed in both the subjects. If 220 passed in both the subjects. Find the number of students appeared in the examination ?
What is the least number of squares marbles required to pave the floor of a room 15 m 17 cm long and 9 m 2 cm broad?
Find the difference of the minimum number of numbers required to form every number from 1 to 1234 and 1 to 4321.
600 tennis players 4% ->wrist band on one wrist of remain 96%->25%->on both hands remain no of ---
If Log2 x - 5 Log x + 6 = 0, then what would the value / values of x be?
Find the next series number 0, 6, 24, 120, 210, ---, ----
Three men A, B, C can complete a work separately in some specified days (May be 8, 7, 6).If they do the work together by alternate days. Then how many days need to complete the work?
12 men can build wall of length of 12m in 10 days how many men are required to build 20 m in 15 days.
A can have a piece of work done in 8 days, B can work three times faster than the A, C can work five times faster than A. How many days will they take to do the work together ?
WRITE A LEAVE LETTER TO YOUR MANAGER