Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is variant material ?

Answer Posted / hemant baviskar

For the same material code but different child items
combination required for this variant is used. KMAT type or
for FERT material in basic view we have to tick.By
assigning character & class(300)we can use this facility.

Is This Answer Correct ?    9 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is plm (product lifecycle management) in sap pp?

1003


What are some important tables used in pp (production planning)?

1057


Difference between plan cost, Actual cost and target cost.

3012


What are all the settings done for configuring the integration of pp with fico?

1059


How to create opbject dependencies in a bom for a configurable material?

1205


In the monthly lot size proc, how to generate lot at the end of Period?

4399


Are there any reports in sap to list of material requirement from ltp ?

1065


What are the levels of batch, explain batch determination process?

1497


What is the use of data in work centers?

1056


What is collective order. Pre requisite of the collective order?

2797


Where have we to specify the teardown time in one operation?

1008


What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?

1179


Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.

1961


How did you configure the payscale structure?

1074


What is Production scheduling Profile and use of it?

1739