If I have 3 different process chains then how can I create
a Metachain including all these 3 local chains ? Step by
Step procedure would be much appreciated as I am going to
try the suggestions provided on system. Thank you.
Answer Posted / ola oladute
Use event-controlled processing to automates all the 3
local chains as follows:
1. Use t-code SM62 to create an Event
2. Go to SM36 to create a job
3. Click on start condition, give the start date and time
of Process Chain no. 1
4. Create the job using program BTC_EVENT_RAISE. In the
variant give the event name as A
5. Include the event A in step 4 in the start condition of
PC (Process Chain) no. 1. Also include a program that will
raise event B
6.Include event B name in the start condition of PC no. 2.
Include a program that will raise event C
7.Include the event C name in the start condition of PC no.
3.
8. Go to SM64 to trigggered the event
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
What is a content extraction?
what is the difference between pdf and excel format after saving the report?
What are the important aggregation usage indicators?
What is the use of infocube in the bw system?
How would you do the archiving cubex.
what do you mean by transfer routines
What is a validity determining characteristic?
Explain the architecture of the sap bw system and its components?
What are extractors?
Are there any limitations for bex analyzer?
What are extractors? Name a few which are used commonly in the sap bw?
Describe the new BW 3.x authorizations?
What is a profitability segment?
what is a multiprovider? what are the uses and in which case supposed to be use? difference between bi7.0/bw3.5?
What is an event chain?