If I have 3 different process chains then how can I create
a Metachain including all these 3 local chains ? Step by
Step procedure would be much appreciated as I am going to
try the suggestions provided on system. Thank you.

Answer Posted / ola oladute

Use event-controlled processing to automates all the 3
local chains as follows:

1. Use t-code SM62 to create an Event

2. Go to SM36 to create a job

3. Click on start condition, give the start date and time
of Process Chain no. 1

4. Create the job using program BTC_EVENT_RAISE. In the
variant give the event name as A

5. Include the event A in step 4 in the start condition of
PC (Process Chain) no. 1. Also include a program that will
raise event B

6.Include event B name in the start condition of PC no. 2.
Include a program that will raise event C

7.Include the event C name in the start condition of PC no.
3.

8. Go to SM64 to trigggered the event

Is This Answer Correct ?    8 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the restrictions DB connect?

1580


What is a profitability segment?

1722


What is the use of infocube in bw system?

516


Apart from r/3, which legacy db you used for extraction ?

505


which patch u used presently? How can I know which patch that one?

1058






Explain multiprovider?

523


Will customers continue to receive support for older versions of sap bw?

518


What are the settings for Transport?

1620


How to fetch the data from sap-r/3, sap-bw/bi to informatica system? what is step by step procedure? at what senario you retrieve the data from sap system to informatica or say dwh system? --

4533


List the steps to configure sd and mm for bw.

504


What is the table filled when you select ABAP?

1640


What is update mode for master data?

1661


What are the added features in 3.x for multi provider?

1501


Does it have delta facility?

1733


What are the precautions to generate a report on DSO in sap Bi?

3355