Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Trapezoidal section footing calculation of Volume & its Area

Answer Posted / sweety

((L+B)D+h/3)(A1+A2+root of(A1+A2))

Is This Answer Correct ?    5 Yes 14 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?

3189


In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?

1966


What is the procedure of concealed plumbing in toilets?

2346


detailed calculation of the amount of cement used?

2069


What are the causes of building collapse?

1159


pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer

3095


Floor tile measurement? Wall to wall or skirting to skirting

1830


If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?

1705


How to arrive dry volume of concrete (1.52 to 1.57) ?

2341


if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete

2078


What is labor and material payment bond?

1157


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

2137


What is meant by cartesian coordinate system?

1156


What is made from large rocks, which protects the base of cliffs?

1296


estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?

1881