If there is no sufficent time for testing & u have to
complete the testing then what will u do?
Answer Posted / murali
If I had very less time for testing the application I will
do adhoc testing,exploratory testing,sanity and UAT .This
will be enough for testing,
pls correct me I am wrong
Muralidharan
dharanmu@yahoo.com
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What is the procedure of manual testing?
I know functional test cases are derived from frs and system design specs. But are test cases for performance, database, boundary, relational integrity and other types of tests other than functional tests created from frs and system design specs as well? When are these test cases created? Are they in the same test plans alongside functional test cases or is their a different test plan that includes these test cases?
What is known as data-driven testing?
What is Registry?
How to do the performance testing manually? Does you have a test case for that?
What are the main key components in client and server applications?
what is localization and globalization.and what are the ways way are going to test the particular application?how can we identify factual, visual, corrupted characters, link errors, formatting errors, etc in locallization?iam going to attend the interview on localization concepts and languages like : German, Japanese, French, Russian, Italian, Chinese, Korean, Portuguese and Spanish .tell me the process how to do testing above concepts let me know its urgent:anilaluvala@gmail.com 9908814046
What is a bug triage?
What r the things,u prefer and prepare before starting testing?
What is the difference between functional testing and integration testing?
Easiest way to write test cases? How i can learn writing the test cases?
1) Difference between "Delete" and "Concatenate" with reference to databases? 2) Difference between SDLC and STLC. 3) Latest versions of the browsers used. 4) What is URL Tampering? 5) Full form of URL. I don't need the answers. These are just for reference.
what are the risk factors in the project? what is the base for testplan and entry criteria ,exit criteria for test plan?
If you are handling a product testing and if there are around 100 test cases and in them few test cases are failed then at the end of the day how will you treat whether the product is pass/fail.? consider the failed test cases are in functional requirements.
What are the different levels of manual testing?