Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

I've one slab of 24m x 43m. How to calculate required steel
For this slab.

Answer Posted / surajit ghosh

LBD= 24 X 43 X 0.125 (SAY, REQUIRED TO ACHIEVE AS PER
DESIGN)= 129 CUM
VOLUME OF STEEL 1% (SAY, REQUIRED TO ACHIEVE AS PER DESIGN
& BBS)= 1.29 CUM= 1.29X 7850 kG= 10126 kG, Apx= 10 Ton.

Is This Answer Correct ?    14 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water

2134


door and window wood work calculations and different methods

2208


What is Grid floor and mention its advantages ?

3302


What is Curtailing of R/F

2524


significance of specific surface area of particles?

2306


how much required strength of cement concrete bricks(size 230x115x75mm)

2043


what is the use of beam end forces while using a staad ? wha they are show

3015


Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.

2465


What out turn civil works

6868


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2208


what are the values of compressieve strenght?

2106


How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9

2129


What is c.g.i sheet which used for roof??

1982


what is m30 in concrete tiles

2410


rate analysis for cement pointing 1:4 , for 100 sq m

4229