Answer Posted / amit
m 30 represents the compressive strenth of concrte in mix
it denoted the 30 n/mm2 compressive strenth at the end of
28 days curig
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
Differentiate orthographic and isometric projections?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
What is the snap size in civil and how can we create it?
Why should you show Client/Engineer activities clearly on the project plan?
important question on stones
How to calculate plastering for elevated water storage tank
What is the absolute pressure scale?
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
what is the function of GSB all class ?
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
Describe the role of independent Quantity surveyor?
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?