Answer Posted / manoj m
1. Routing
2. Workcenter
3. BOM
4. MRP
5. Capacity Planning
6. Production Order
| Is This Answer Correct ? | 10 Yes | 6 No |
Post New Answer View All Answers
Suppose the client wants me the vacancy to be displayed on a website as well as ess. How should I do it?
How many levels of Flexible Planning are there?
How is the processing time calculated in a wc when both labor, machine categories exist?
What is the need of mrp list if the stock requirement list is already given?
In sap-pp what are the costing parameters?
What happens to planned after it has been converted into production order ?
What is purpose of schedule margin key?
How do you do capacity planning ?
Explain Flexible Planning procedure or How many levels of Flexible planning.
What is plm (product lifecycle management) in sap pp and what is the use?
What is the role of an administrator in pa?
Explain the gaps and the steps involved in them.
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
Control keys
What is Backflush, the places where the backflush is used?