Method of findingthe dry ingredient quantity of 1 m3
concrete.
Answer Posted / shilpa
2%
Is This Answer Correct ? | 16 Yes | 10 No |
Post New Answer View All Answers
How did street originate in the plumbing term street ell?
Explain why concrete barriers have curved surface profiles?
How can I make justification between using concrete grade c35 compare c37?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
what is the productivity in aluminium shuttering per day
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
What is change order request?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
how to estimate material requirement for an area of house in square feet?
what is BPM in concrete demolition hammers. what is better a higher value or lower
Prepare a Schedule for a Highrised building from starting stage to Handover?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
what is the anchorage length of reinforcement.
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT